This project was delivered within a live school environment, requiring close coordination with the school’s management team to ensure safety and minimal disruption. We maintained segregated access routes throughout to avoid interface with staff and pupils during term time.
The new Healthy Hearts Hall—a multi-use indoor activity space—was constructed using Cross Laminated Timber (CLT), which required precise service coordination. All electrical routes, containment, and penetrations were incorporated into the fabrication drawings from the outset, with no scope for change post-approval. This demanded accurate design and a tightly controlled installation process.
General Electrical Works:
-
Provision of Site Temporaries
-
Installation of High-Level Trunking and Cable Tray Systems
-
Mains Incoming Supply Upgrade and coordination with the network operator
-
Full installation of Galvanised Steel Conduit from containment through to final circuits
-
Small Power Systems – both first and second fix
-
High-Level Internal & External Lighting installation
-
Complete Earthing & Bonding throughout the installation
-
Delivery of As-Built Documentation and certification on completion
Specialist Systems Installed:
-
New Addressable Fire Alarm System integrated with the existing school system
-
Intruder Alarm installation
-
Structured Data Cabling throughout the new hall
-
Installation of Lightning Protection system
-
Electrical connections for all Mechanical Plant and System
- Specialist disabled alarm systems.